Basic Info.
Output Type
AC Three Phase
Certification
CE, ISO, CCC
Tower Reactor Type
Spray Tower Reactor
Heat Transfer Structure
Combined
Automatic Grade
Automatic
After-Sales Service
Provided
Transport Package
Standard Export Package or Customized
Specification
Stainless Steel
Product Description
Wet Desulfurization Project for Biogas Purification System
Wet desulfurization system is a standard desulfurization process specially designed by our company according to customers' requirements. The process can achieve gas desulfurization, absorbent regeneration, filtration and sulfur melting applying physical and chemical methods.
It can run for a long term and desulfurize continuously while producing sulphur, the byproduct. Also, the process has advantages of large processing capacity and high desulfurization precision. We can design and manufacture products based on requirments of our customers to meet the ideal effect you need.
The wet desulfurization system has two kinds of relevant equipment: high-tower absorption tank and regeneration tank. Both have their own characteristics.
Wet Desulphurization ProcessThe main hazards of hydrogen sulfide in gas are as the followings : toxic to human body, corrosive to metal equipment and polluted to environment. So sulfur must be removed from biogas. This process is to use alkaline liquid to absorb H2S in the gas, so that the gas can be purified. After absorbing H2S, the alkaline solution is recycled under the catalysis of desulfurizer. Sulfur paste (or sulfur) is prepared by compressing and separating (or melting sulphur). In the cooling tower, the hot water flows through the water seal to the hot water pool. The chilled water chestnut is sent to the cooling tower for cooling and recycling.
The biogas from the gas tank is reversely contacted with the upper and lower cold water through the lower part of the cooling tower. In the process of contact, the gas temperature drops and the impurity in the gas is removed. After entering the roots blower, entering the general pipe of the outlet of the blower, then entering the lower part of the desulphurization tower, entering the spray desulphurization tower through the gas distributor, reverse contact with the desulfurizing liquid which is sprayed on the top of the tower, and then entering the FGD tower and spraying the tower again with the top of the tower. The desulfurization solution is reverse contacted to remove H2S from the gas, and the purified gas comes out from the top of the desulfurization tower and enters the post process.
Schematic diagramComparison of Different Desulfurization Process Comparison | Wet Desulfurization | Dry Desulfurization | Biological Desulfurization |
Construction Cost | low | low | high |
Operating Cost | high | high | low |
Efficiency | 99% | 85%-95% | 99.50% |
Final Product | effluent / sulfur | solid waste | elemental sulfur |
Secondary Pollution | positive, need to dispose effluent | positive, solid waste pollution | negative, elemental sulfur can be reused |
Management System Certification: ISO9001:2008, ISO14001:2004, OHSAS18001:2007
Clients' Projects: 15000 m^3 Assembled Anaerobic Digestion Tanks in Malaysia10000 m^3 Anaerobic Digestion Tanks for Cow FarmsManagement System Certification: ISO9001:2008, ISO14001:2004, OHSAS18001:2007About Our CompanyAdhering to concept of low energy consumption, low pollution & sustainable environmental protection, we provide one-stop solid waste sewage treatment, harmless treatment of dead animals, odor treatment solutions, municipal sludge, meal waste, domestic waste recycling and reuse, multi-purpose waste incinerator, buried integrated sewage treatment equipment etc. As a comprehensive industrial enterprise that integrates R & D, production and sales with over 20 years' experience, especially the guaranteed supplier of China Manufacturing Network, we mainly have 2 production bases with rich experience in installation & construction. Our yearly capacity is over 30,000 square meters, which enable very quick delivery. What's more, professional after-sales service is provided, which includes free remote technical guidance and installation debugging, so that customers needn't worry about products' integrity. Until now, we have cooperated with over 300 companies among 50 countries and regions, already gained much reputation around the world. Factory And International Certificate
Pre-Sales & After-Sales Service 1. service network
The service network is Distributed in national & abroad regions and form a complete set of supporting offices, formed a sound service network, the user services will be in place in 48 hours, convenient and efficient.2. pre-sale serviceAccording to user requirements, we will offer a variety of designs; help the user to select the most appropriate equipment; More for the sake of users, to design a floor plan for the users, and also a reasonable configuration.3. installation and debuggingCompany has experienced professional technicians and senior workshop technicians for free on-site training of buyer's operators and responsible for the guidance of equipment installation, guarantee the operation of the equipment, and to achieve the desired effect.4. On-site serviceSince the date of installation, the company will send engineers for on-site guidance, to supply a timely solution of equipment normal state can not run, which due to the unskillful operators who are not familiar with our machine, and guide the users to grasp the solution of the problems during using the equipment.5. after-sales maintenanceSince the date of Qualification adjustment, one year warranty, guarantee the quality of the product if non-users artificially, my company free repair. Since the end of the product warranty period, the supplier provide maintenance service for life, and should be paid to provide accessories, appropriate preferential charge for repairs. 6. operation trainingDetailed work instructions, professional and technical personnel on-site guidance operation; Regular training for each operator, to make them truly knowledgeable, systematic and professional.Shipping And Delivery
FAQ : 1. How to pay? A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.2. What is the delivery time?A: It depends on order quantities. If you'd like to inform detailed quantity, we will immediately help check for you. 3. How to pack the products?A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.4. How to install after the equipment arriving destination? A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.Contact UsExperience, expertise & innovative spirit have always contributed to our company's growth. If you have any questions please just feel free to contact us, our great honor to offer a solution.
Address:
Room 905, Building 5, Tianan Digital City, 88 Chun Yang Road, Chengyang District, Qingdao, Shandong
Business Type:
Trading Company
Business Range:
Manufacturing & Processing Machinery
Management System Certification:
ISO 9001, IATF16949, HSE, QC 080000, GMP, BSCI
Company Introduction:
Qingdao Youfeng Environmental Protection Equipment Co., Ltd. is located in Qingdao City, Shandong Province. It is a comprehensive industrial enterprise that integrates R&D, production and sales. The company has two production bases with rich experience in installation and construction. The number of employees with bachelor′s degree or above accounts for more than 60%.
The company adhering to the concept of low energy consumption, low pollution and sustainable environmental protection, together with many agricultural and animal husbandry enterprises, focus on the sustainable development of farming and management, to achieve a win-win situation of ecology and economy. Provide one-stop solid waste sewage treatment, harmless treatment of dead animals, odor treatment solutions; Municipal sludge, meal waste, domestic waste recycling and reuse; Multi-purpose waste incinerator; Buried integrated sewage treatment equipment and various automation, intelligent equipment research and development.